Galaxy Lithium-ion Battery Cabinet
Failure to follow these instructions can result in equipment damage. Please Note Electrical equipment should only be installed, operated, serviced, and maintained by qualified personnel.
Battery cabinet systems are very heavy. Total weight of a loaded cabinet can exceed 6100 lbs. Use at least 3 people when unloading and setting equipment in place. It is imperative that only qualified personnel work on this system and installation, maintenance or upgrades be performed with insulated tools and equipment.
• The battery cabinet must be properly earthed/grounded and due to a high leakage current, the earthing/grounding conductor must be connected first. Failure to follow these instructions will result in death or serious injury. Battery Safety DANGER
Never enclose batteries or battery cabinets in a sealed air tight room. All jewelry and watches must be removed prior to installing or servicing this system. Do not smoke or present flame near or around any battery cabinet system. Never leave a panel off or door open and unattended. 3. INSPECTION UPON RECEIPT OF GOODS
1. Perform the following steps on all battery cabinets in the battery solution. a. Remove the cover in front of the start-up button and push the start-up button. • The PSU2 LED and the POWER LED will turn on. • The ABNORMAL and ALARM LEDs should remain off. b. Reinstall the cover in front of the start-up button.
PDF version includes complete article with source references. Suitable for printing and offline reading.
Download detailed specifications, case studies, and technical data sheets for our ESS containers and containerized PV systems.
15 Rue des Énergies Renouvelables
Paris 75015, France
+33 1 84 83 72 76
Monday - Friday: 8:30 AM - 6:30 PM CET