UBC80 Battery Cabinet Installation, Operation,
When installing this power system, follow all applicable federal, state and local regulations as well as industry guidelines to insure proper system installation. Only qualified electricians or DC
1. Perform the following steps on all battery cabinets in the battery solution. a. Remove the cover in front of the start-up button and push the start-up button. • The PSU2 LED and the POWER LED will turn on. • The ABNORMAL and ALARM LEDs should remain off. b. Reinstall the cover in front of the start-up button.
• The battery cabinet must be properly earthed/grounded and due to a high leakage current, the earthing/grounding conductor must be connected first. Failure to follow these instructions will result in death or serious injury. Battery Safety DANGER
Attach a signal cable3(not provided) to the male adapter connector in the correct length to reach from the battery cabinet to the UPS. As an alternative, you can also crimp the signal cable extensions. Ensure that the crimp point is inside the battery cabinet, not in conduits or cable trays outside the battery cabinet.
• The battery cabinet contains an internal energy source. Hazardous voltage can be present even when the UPS system is disconnected from the utility/ mains supply. Before installing or servicing the UPS system, ensure that the units are OFF and that utility/mains and batteries are disconnected.
PDF version includes complete article with source references. Suitable for printing and offline reading.
Download detailed specifications, case studies, and technical data sheets for our ESS containers and containerized PV systems.
15 Rue des Énergies Renouvelables
Paris 75015, France
+33 1 84 83 72 76
Monday - Friday: 8:30 AM - 6:30 PM CET