Mobile Energy Storage Charging Pile in the Real
As urban areas grow smarter and energy demands increase, mobile energy storage charging piles are becoming essential components
By using the energy storage charging pile's scheduling strategy, most of the user's charging demand during peak periods is shifted to periods with flat and valley electricity prices. At an average demand of 30 % battery capacity, with 50–200 electric vehicles, the cost optimization decreased by 18.7%–26.3 % before and after optimization.
To optimize grid operations, concerning energy storage charging piles connected to the grid, the charging load of energy storage is shifted to nighttime to fill in the valley of the grid's baseline load. During peak electricity consumption periods, priority is given to using stored energy for electric vehicle charging.
Based Eq., to reduce the charging cost for users and charging piles, an effective charging and discharging load scheduling strategy is implemented by setting the charging and discharging power range for energy storage charging piles during different time periods based on peak and off-peak electricity prices in a certain region.
Based on the real-time collected basic load of the residential area and with a fixed maximum input power from the same substation, calculate the maximum operating power of the energy storage-based charging pile for each time period: (1) P m (t h) = P am − P b (t h) = P cm (t h) − P dm (t h)
PDF version includes complete article with source references. Suitable for printing and offline reading.
Download detailed specifications, case studies, and technical data sheets for our ESS containers and containerized PV systems.
15 Rue des Énergies Renouvelables
Paris 75015, France
+33 1 84 83 72 76
Monday - Friday: 8:30 AM - 6:30 PM CET