The had almost two (GW) of capacity at the end of 2010, but installed less than 10 megawatts (MW) in 2011 due to the being reduced by 25%, after installing almost 1,500 MW the year before. Installations increased to 109 MW in 2012. In 2014, no new installations were reported.
[PDF Version]
The building of the pumped-storage power plant is connected with the upper basin by 6-pressure reinforced concrete and metal pipelines with a diameter of 3.8 m. The upper basin was created at a height of 70 m above the level of the Kyiv reservoir with a useful volume - 3700000 cubic meters, where during the night decrease in energy consumption in the power system water is pumped. T. OverviewThe Kyiv Pumped Storage Power Plant (PSPP) (: Ки́ївська гідроакумулювальна. . • 1963 - Beginning of the construction of the Kyiv hydroelectric power plant. The underwater part of the HPP building and the installation site was built; • 1964 - filling of the Kievskaya HPP reservoir;. . The main facilities of the pumped-storage power plant include the upper pumped-storage basin, the power plant building and the installation site. Six vertical hydroelectric units are installed in the building of t. . Stage I At the initial stage of operation of the pump-turbine units, complications arose due to the significant vibration of the guide vanes. Vibration in different points of the hydro unit even with t.
[PDF Version]